In the past, soil stabilization was done by utilizing the binding properties of cement based products and lime in clay soils. BBM® is a new technology product classified as green technology.

BBM® Application

There are basically two methods. After the soil content and moisture analysis, the amount of cement and BBM® and the application method are determined by considering the purpose of use of the road and the data obtained.

​

Spraying Method; Diluted BBM® is sprayed onto the surface after the cement mixed soil is leveled. Then the soil is compacted.

​

Mechanical Method; Cement and diluted BBM® are mixed into the soil by reclaiming machines or mechanical mixers to obtain a homogeneous mixture. Then the soil is laid, leveled and compacted.

​

The amount of cohesive fines (silt and clay) in the soil is the main factor in the selection of the method. BBM® can be applied to most soil types. 

​

Cement is added at the rate of 2%-5% of the soil weight to be processed, and BBM® is added at the rate of 2%-4% of the optimum water content.
 

4.1.1_Technology_Soil_Stabilization
4.1.2_Technology_Soil_Stabilization
4.1.3_Technology_Soil_Stabilization
4.1.4_Technology_Soil_Stabilization
4.1.5_Technology_Soil_Stabilization
4.1.6_Technology_Soil_Stabilization
Spraying Method Steps

• mix cement within soil

• place cemented soil and grade

• spray the solution onto graded soil

• compact the optimum moistured soil

Stabilization Proses machines illustrated by the producer Wirtgen-Group 

4.2.1_Roadtypes_Soil_Stabilization.png

• binding agent spreader

  /solution sprayer

• soil stabilizer/reclaimer optional

integrated spreader and/or sprayer

•  padfoot soil compactor

•  grader

•  smooth drum soil compactor

Mechanical Method Steps

• mix cement and solution within soil by a mechanic mixer or reclamier

• place and/or grade the treated soil

• compact the optimum moistured soil

• mechanic mixer any kind that mix homogeneously

4.2.2_Roadtypes_Soil_Stabilization.png
In-Situ BBM® Application

• grade / rip / mill the soil

• apply method steps

Make sure of:

• soil anaylse results

• proper drainage

• homogeneous mixture

• compliance with cement hydration time